Download the Case Study SITUATION Client engaged Pressure Dynamics to conduct a luffing wire rope changeout, following previous issues arising for the work scope. PROBLEM The old luffing wire rope had been dropped during a previous attempt (by a different...
Download the Case Study SITUATION The client required the execution of the: Annual Marine Loading Arm inspections 5-yearly Hydraulic Hose Replacement PROBLEM Various emergent work scopes were identified through the inspection and hydraulic hose replacement work...
Download the Case Study SITUATION Client required annual API-compliant inspection of offshore pedestal crane in compliance with client and crane OEM inspection and testing procedures and specifications. PROBLEM Client has experienced challenges for inspection...
Download the Case Study SITUATION A crane inspection and fatigue life study is essential to assess a crane’s suitability for continued safe use. PROBLEM Gantry cranes require major inspection and fatigue life study to determine its safety and lifespan. ...
Download the Case Study SITUATION Numerous uncontrolled load-lowering incidents had been experienced on the auxiliary winch of the FPSO port crane. 2 other contractors and the OEM had failed to identify the root cause of the fault. PROBLEM Without a functioning...
Recent Comments