Pressure Dynamics and Tutt Bryant Group Limited worked together to safely install a new 10t overhead crane. During the installation we had to overcome difficulties due to the limited head room for the crane to operate. The installation was completed over a long...
We recently worked with a valued client to install a new wellhead to increase their production capacity. Pressure Dynamics was responsible for supply, installation and commissioning of new tubing run which involved collaboratively working with the client’s wider team....
Pressure Dynamics custom designed Test & Flushing Hydraulic Power Unit (TFHPU) returned to PDs Darwin Branch for planned servicing and maintenance. This TFHPU was built in 2014 for Flushing and Testing the operation of Subsea Control Modules (SCM) to...
It was great to see one of our valued clients engaging Pressure Dynamics to implement critical safety changes to their Hydraulic System. Pressure dynamics was part of the team to assist with Management of Change (MOC) on a production critical offshore asset....
The slew drive system and cylinders on this Wharf Gangway are nearing their 10-year mark. Pressure Dynamics was engaged by the client to replace all valves, hoses, change out worn and corroded components and give the slew drive assembly a full blast of paint. As with...
Recent Comments