Pressure Dynamics and Tutt Bryant Group Limited worked together to safely install a new 10t overhead crane. During the installation we had to overcome difficulties due to the limited head room for the crane to operate. The installation was completed over a long...
Download the Case Study SITUATION Client engaged Pressure Dynamics to conduct a luffing wire rope changeout, following previous issues arising for the work scope. PROBLEM The old luffing wire rope had been dropped during a previous attempt (by a different...
Recent Comments